KULOB, April 8, 2011, Asia-Plus -- Another small hydropower plant has been built in Khatlon’s Kulob region.
The 16kW hydropower station was introduced into operation in the village of Khorma, Baljuvon district yesterday.
“It is the fourth small power plant in Baljuvon and it brings a total number of small hydropower plants in the Kulob region to 74,” the Kulob power supply network head Mirzo Ismoilov told Asia-Plus in an interview. 68 small power plants are located in Shouroobod district, four in Baljuvon and two in Khovaling district.
According to him, 64 small power plants with a total capacity of 446 kW operated in three mountain districts of the region during autumn-winter 2010-2011, while nine others were not in operation for a number of reasons.
Meanwhile, construction of a small hydropower plant in the Mehnatobod village of Vose district is under way. Ismoilov says introduction of the Khorma (Baljuvon) and Mehnatobod small power stations into operation increases a total capacity of small power plants operating in the area to 681kW.




US allies decline Trump’s call to send warships to the Strait of Hormuz
Average salary in Tajikistan rises by 17.3% year-on-year
Tajikistan begins implementing CIS agreement on locust control
Tajikistan needs about $1 Billion annually to tackle climate change
Nearly 30 Cultural Heritage Protection Projects Launched by the European Union and ALIPH in Central Asia
Fears of Iranian refugee influx grow in Central Asia as war intensifies
Former head of Sughd regional health department released after paying fine in bribery case
How much does school education actually cost in Tajikistan?
From markets to online platforms: how consumer rights are protected in Tajikistan
European investment fund to invest over $200 Million in Tajik new privately-owned airline
All news
Авторизуйтесь, пожалуйста